Specifications include, but are not limited to: WATER MAIN RELAYS, at the following locations: N. 100th St. (WT410220600), W. Capitol Dr. to W. Grantosa Dr. (26 working days); W. Grantosa Dr. (WT410220614), 225’ E/O N. 100th St. to N. 100th St. (6 working days); N. Burbank Av (WT410220621), W. Casper St. to W Green Tree Rd. (10 working days); N. 84th St. (WT410220622), W. Mill Rd. to N. Burbank Av. (51 working days); W. Acacia St. (WT410220623), N. 77th St. to N. 80th St. (19 working days); N. 78th St. (WT410220624), W. Acacia St. to W. Casper St. (21 working days); W. Casper St. (WT410220625), N. 77th St. to N. 78th St. (7 working days); N. 100th St. (WT410220651), W. Nash St. to W. Lisbon Av. (44 working days); N. 98th St. (WT410220652), W. Metcalf Pl. to W. Lisbon Av. (8 working days); N. 85th St. (WT410220673), W. Capitol Dr. to W. Olive St. (26 working days); W. Olive St. (WT410220674), N. 85th St. to N. 88th St. (18 working days); N. 88th St. (WT410220675), N. Colgate Cr. to W. Marion St. (16 working days); N. 83rd St. (WT410220676), W. Capitol Dr. to W. Hope Av. (25 working days); W. Fiebrantz Av. (WT410220677), N. 82nd St. to N. 84th St. (11 working days); N. 20th St. (WT410230001), W. North Av. to N. Hopkins St. (10 working days); . (Note: Contractor to furnish and install approximately 14575 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe.