Specifications include, but are not limited to: MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; TRAFFIC CONTROL 1.000 LS; RAILROAD INSURANCE AND FLAGGING 001 1.000 LS; REMOVAL & DISPOSAL OF EXISTING PAVEMENT 4,350.000 SY; REMOVAL & DISPOSAL OF EXISTING CURB 3,940.000 LF; BORROW EXCAVATION 1,372.000 CY; EXCAVATION FOR SHOULDER PAVING 724.416 STA; HAULING OF EXCAVATED SHOULDER MATERIAL 724.416 STA; MAINTENANCE STONE 163.500 TON; HMA SHOULDER WIDENING COURSE 4,829.440 TON; LIQUID ASPHALT BINDER PG64-22 1,534.127 TON; ARAMID FIBER 1,116.060 LB; FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 12,850.000 SY; FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 3,500.000 SY; MILLING EXISTING ASPHALT PAVEMENT 2.0" 145,010.000 SY; MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 470.000 SY; MILLED-IN RUMBLE STRIP 13.720 MI; HOT MIX ASPHALT SURFACE COURSE TYPE B 21,964.227 TON; HOT MIX ASPHALT SURFACE COURSE TYPE D 685.000 TON; DRIVEWAY PAVING-SURFACE TYPE D 616.875 TON; MILLING EXISTING CONCRETE PAV. 2.0" 3,000.000 SY; PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,477.000 SF; 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 5,385.000 LF; 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 226,260.000 LF; 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 5,925.000 LF; 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 5,115.000 LF; WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 105.000 EA; WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 75.000 EA; WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 9.000 EA; RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 6.000 EA; 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 19,455.000 LF; 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 237,321.000 LF...