Specifications include, but are not limited to: MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; TRAFFIC CONTROL 1.000 LS; REMOVAL & DISPOSAL OF EXISTING PAVEMENT 339.990 SY; MAINTENANCE STONE 80.300 TON; LIQUID ASPHALT BINDER PG64-22 1,549.268 TON; LIQUID ASPHALT BINDER PG76-22 1,011.611 TON; FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 8,030.000 SY; MILLING EXISTING ASPHALT PAVEMENT 2.0" 464,140.000 SY; MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,700.000 SY; MILLED-IN RUMBLE STRIP 14.440 MI; HOT MIX ASPHALT SURFACE COURSE TYPE A 18,392.930 TON; HOT MIX ASPHALT SURFACE COURSE TYPE B 27,002.426 TON; DRIVEWAY PAVING-SURFACE TYPE C 1,018.000 TON; PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,944.000 SF; 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 44,988.000 LF; 6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 36,225.000 LF; 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 184,605.000 LF; 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 133,320.000 LF; 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 21,525.000 LF; 12" WHITE SOLID LINES - FAST DRY PAINT 12,750.000 LF; 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 29,610.000 LF; WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 271.000 EA; WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 174.000 EA; WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 26.000 EA; WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 12.000 EA; 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 30,180.000 LF; 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 278,055.000 LF; 6"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 124,440.000 LF; 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 15,010.000 LF; 24" YELLOW DIAGONAL LINES - FAST DRY PAINT 750.000 LF; 4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT 530.000 LF; 6" WHITE BROKEN LINES -(GAPS EXCLUDED) EPOXY PAINT 720.000 LF...