Specifications include, but are not limited to: Following the closure of the bid submittal period, bids will be publicly opened and read for performing work as follows: Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as Flamson SchoolPedestrian Enhancements, DPW Project No. 20-25, according to drawings and specifications prepared by the City of El Paso de Robles and according to the Contract Documents. The work shall include but is not limited to, demolition and removal of existing curbs and gutters,installation of new curbs and gutters, curb ramps, streetlights, pavement striping and markings,and modifications to an existing traffic signal, and installation of rectangular rapid flashingbeacon (RRFB), all as shown on the plans and/or as specified herein