Specifications include, but are not limited to: 1. This contract is to provide the UDOT with Cover Material as per the Specification in attachment Special Provisions Chip Seal Coat. 2. Stockpile at the locations and by the methods designated in Table 1. 3. Deliver by the date indicated in Table 1 for each delivery location. 4. Delivery A. Cover Material will be delivered between the dates identified in the contract documents. B. The District Engineer or designee will notify the contractor of specific delivery date a minimum of seven days prior to delivery. C. Deliver Cover Material between the hours of 7:00 AM and 3:00 PM Monday through Thursday. 5. Stockpiling A. Stockpile at the locations and by methods designated by the Department. B. Stockpile Methods. 1. Method 1: Stockpile by butting loads. a. Use end dumps, end dumps and pups, or belly dumps. b. Butt end dump loads one against the other in such a manner to occupy as small a total stockpile area as possible. c. If supplier uses belly dumps or pups, push up the stockpile to a uniform 10-foot height. Maintain stockpile height using supplier-provided equipment. d. If the Engineer is not satisfied with stockpiling, supplier reshapes the stockpile to an acceptable configuration. e. If Department personnel reshape the stockpile, Department deducts reshaping cost from amounts due supplier. 2. Method 2: Stockpile by supplier-furnished loader. a. Use end dumps, end dumps and pups, or belly dumps. b. Buck up and place load using supplier-furnished loader and operator. c. Build and buck up stockpiles to a uniform 10-foot height. d. If the Department is not satisfied with the stockpiling, supplier reshapes stockpile to an acceptable configuration.