Specifications include, but are not limited to: Provide design-build services for consolidation and relocation of select services within Coffman Union, located on the east bank of the Twin Cities campus. Project A (Bookstore/Print Services/Coffman Consolidation # 01-064-24-2622) includes the relocation of Print Services, Convenience Store (also known as Gopher Express), and the Post Office operations (approximately 2,800 SF) into the existing footprint of the University of MN Bookstore. These operations are currently located on the Ground Floor (slab on grade) of Coffman Union Memorial, but currently not within the confines of the Bookstore. This project will consist of working with the UMN stakeholders to identify space with the University of MN Bookstore and relocate the identified operations. It is anticipated that the relocation of the Post Office and Print Services will have shared amenities and not require a one-for-one relocation of space; details to be confirmed with the stakeholders. This renovation and UMN relocation of operations is required to be complete no later than August 16, 2024 and shall be tracked as a sub-project under the D/B contract. Refer to the attached UMN Space Plan for reference. The vacated footprint of the Print Services, Convenience Store and Post Office will be renovated to accommodate the relocation of Project B (Coffman Cube Chick-Fil-A # 01-064-24-2733), currently located on the Ground Floor (slab on grade) in Minnesota Marketplace at Coffman Memorial Union. The food vendor has provided preliminary kitchen equipment plans of the proposed layout and accompanying foodservice equipment list inventory that has been included in this RFP for reference. The Respondents scope should include the purchase of the identified kitchen equipment represented on the provided equipment list. The vacated footprint of the existing Chick-Fil-A in Minnesota Marketplace is not currently programmed to receive a new tenant and at this time the work within the vacated space will be limited to equipment relocation (if applicable), required disconnections necessary by code to safely vacate, and removal of branding. Refer to the attached DLR Relocation Study for further description and illustration of the work for the CFA relocation. Project B will begin immediately following the vacancy of the prior occupants of Project A.