Specifications include, but are not limited to: Work under this contract consists of sealing cracks from edge of pavement to edge of pavement and to the back of radius on side roads, restriping, and RPM installation in Troup County on SR 109 from MP 11.8 to MP 21.6 and in Fayette County on SR 54 from MP 1.97 to MP 13.00. The contractor shall furnish all labor, materials, equipment, means of transportation, traffic control and incidentals necessary to perform work. This contract shall be bid per line item. Any damage to signs, pipes, culverts, drains, bridges, or any concrete structure that occurs during construction shall be repaired or replaced at no additional cost to the department. The contractor shall always inform the designated GDOT inspector of their work schedule as well as their subcontractors’ work schedule prior to completing any work. This work also includes cleaning, removing dirt, grass, and other debris from cracks and asphalt joints within the project limits, and filling with a polymer/ modified asphalt rubber. All travel lanes, turn lanes, and gore areas within the limits shall be crack sealed. Material used for Crack Sealing shall be on QPL 92. All existing mainline traffic striping shall be restriped with thermoplastic traffic striping as per section 653 (thermoplastic striping) upon completion of the crack seal operation. All mainline traffic striping does not include arrows, words, hashed areas, symbols, etc. Striping to be restriped will include skip lines, lane lines, crosswalks, stop bars, and RR symbols. New RPMs shall be installed as per specification 654, and Construction Standard and Detail T15A and T15C after the removal of existing RPM’s. Any temporary striping needed for this project shall be included in the cost of traffic control.