Specifications include, but are not limited to: PROJECT SCOPE 1. In accordance with PLANS AND SPECIFICATIONS documents, contractor(s) shall construct a 75’ x 60’ salt storage bin (excluding center wall in Standard Drawings), metal roof system, and additional concrete pad to the north of existing concrete pad 2. Contractor shall furnish all materials, labor, equipment, and assorted hardware to construct the project as defined in the “CONSTRUCTION REQUIREMENTS” section of this bid package 3. Work item “Concrete Work and Site Prep” shall include: a. All site preparation including grade work, demolition of existing salt bin wall on east side, demolition of salt bin concrete berm at front of bin, and removal of existing roof (in a nondestructive manner) b. Installation of concrete walls (and accompanying steel), concrete pad to the north of existing salt bin concrete pad, and concrete berm at open end of salt bin c. Excludes removal of Redirock walls and material stockpiles 4. Work item “Metal Roof System (Installed)” shall include: d. Metal roofing system including all hardware, structural members, paneling, and materials necessary for installation e. Design Stamped by a Professional Engineer licensed in Tennessee and Shop drawings associated with roof system f. Installation of roofing system...