Specifications include, but are not limited to: 1.In accordance with PLANS AND SPECIFICATIONS documents, contractor(s) shall construct a 75’ x60’salt storage bin (excluding center wall in Standard Drawings), metal roof system, andadditional concrete pad to the north of existing concrete pad2.Contractor shall furnish all materials, labor, equipment, and assorted hardware to construct the project as defined in the “CONSTRUCTION REQUIREMENTS” section of this bid package3.Workitem“ConcreteWorkandSitePrep”shall include:a .All site preparation including grade work, demolition of existing salt bin wall on east side, demolition of salt bin concrete berm at front of bin, and removal of existing roof (in a non-destructive manner)