Specifications include, but are not limited to: Repairs Required: 1. Remove approximately 70-75 linear foot run (North – South) of old piles with whalers that were left underneath the newly constructed pier. These piers are detaching from underneath the pier. Originally, this was a 13- pile run, but it is unknown how many are intact below the waterline. The new pier was constructed over the old structure. These piles were abandoned and need to be removed. These piles are no longer structural. 2. This section needs to be cut from 4 inches below the mud line up for removal (it is partially broken and is considered unstable) 3. Free the section, remove it from site and dispose of it in accordance with all local waste management procedures.; Repairs Required: 1. Nine (9) greenheart pilings require stainless steel bandings; specification of the banding: 1” SS Banding with Krimp Clamps 2. Thirty-eight (38) pilings, including the newly banded nine (9) need to be capped with white plastic pointed pile caps 3. Two nuts need to be added to the whaler bolts near piles 6 and 7 on the south side of the pier; • The selected contractor(s) will perform work in accordance with any applicable local, state, or federal laws/regulation. Work will be performed in a safe and clean manner. Work will also be performed in a manner that complies with applicable OSHA standards. • The selected contractor(s) will provide evidence of appropriate insurance coverages, including Longshoremen and Jones Act Coverage (if applicable). • Staging may be coordinated with the City’s Police Department.