Specifications include, but are not limited to: The Contractor shall furnish all material, labor, tools, supplies, permits, equipment, transportation, superintendence, barricades, temporary protection, bracing, shoring, temporary construction of every nature, compliance with all mandated code, insurance, bonds, taxes, contributions and all services and facilities, unless specifically excepted in the bid response, to install all materials, items, and equipment for a complete turn-key project for the HVAC Air Handler Unit (AHU) Replacements Upgrade which includes but not limited to upgraded controls. The AHU Replacements & Controls Upgrade Project consists of the furnishing of all labor, materials, and equipment, to include removal of three (3) hydronic AHUs, installation of two (2) new AHUs and integration of the new AHUs to the new building control system located at the Spring Branch Campus.