Specifications include, but are not limited to: The project includes the following work: · Installation of approximately 2,000 linear feet of 12” PVC culinary water line (Weber Basin) and 1,600 linear feet of 8” PVC culinary water line (Clearfield City). · Installation of two large pressure reducing valve/ meter vaults with related SCADA and electrical connections. · Installation of 24” fused solid wall HDPE casing pipe and 16” fused solid wall HDPE carrier pipe underneath the UTA and UPRR tracks at 500 West via horizontal directional drill. Work will include assistance with final applications to UTA and UPRR. · Installation of 24” fused solid wall HDPE casing pipe and 16” fused solid wall HDPE carrier pipe underneath the UTA box culvert near 950 West via horizontal directional drill. Work will include assistance with final applications to UTA. · Installation of 16” fused solid wall HDPE casing pipe and 10” fused solid wall HDPE carrier pipe underneath the UTA box culvert near 950 West via horizontal directional drill. Work will include assistance with final applications to UTA. · Resurfacing of concrete bridge deck, other minor bridge repairs and installation of Type F concrete barrier along bridge. · Replacement of curb and gutter, sidewalk, and curb ramps along the roadway. · Replacement of asphalt pavement for approximately 0.6 miles of roadway along with other common roadway work.