Specifications include, but are not limited to: A-BLDG 50 ton chiller replacement; Contractor shall furnish all labor materials, tools, crane, and services required to remove existing defective chiller for the Louisiana Department of Corrections (DOC), David Wade Correctional Center Building A rooftop and replace with one Trane CGAM050F2-2AXB2A1A1A1AX-A1CAXXX (or equal) 50 ton chiller. Contractor shall supply and install new pipes. Contractor shall supply and insulate new piping and properly dispose of old insulation. New chiller shall include hail guards, feet, and low ambient controls supplied and installed by contractor. David Wade Correctional Center will have in place, new disconnect for the contractor to tie electrical into new chiller.