Specifications include, but are not limited to: removal and replacement of rooftop cooling tower, rooftop boiler, associated pumps, piping, supports, electrical, controls and other work required for successful operation of the system.; Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: These requirements include but are not limited to; payment and changes in the work, supervision, project coordination, construction schedule, temporary facilities and controls, on-site construction management, project completion and closeout. Work at existing cooling tower consists of preparation of area by demolition of tower, piping, pumps, valves, supports, emergency eyewash and shower station, and appurtenances for installation of cooling tower, pump, basin sweeper, support, controls, piping, valves and devices required for successful operation of the system. Work at existing boiler consists of preparation of area by demolition of boiler, piping, pump, valves, expansion tank, controls, supports and appurtenances for installation of boiler, pump, expansion tank, support, controls, piping, valves and devices required for successful operation of the system. Electrical work includes power distribution and service to all HVAC equipment and controls. Demolition work required at cooling tower and boiler systems and demolition motor control center inside electrical room and removal of all unnecessary and abandoned electrical boxes and conduits. Testing, adjusting and balancing of the hydronic systems. System commissioning per requirements of contract documents. Integration of the new and existing BACnet control system.