Specifications include, but are not limited to: The Project consists of furnishing all labor, materials, necessary tools and machinery, supervision and support, demolition and hauling of debris required for the roofing project, including but not limited to the following tasks: Preparation of the Existing Roof Surface: • Examine substrates, areas, and conditions, with Installer present, for compliance with the following requirements and other conditions affecting performance of roofing system; • Proceed with installation only after unsatisfactory conditions have been corrected; • Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation; • Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast; • Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast. Remove and discard temporary seals before beginning work on adjoining roofing. Installation of the Roofing Systems, Crickets, Substrate Membrane and Flashing: • Install new drains at specified locations and match existing drain size and outlet piping; • Install new metal cap for unit removal door; • Install crickets as specified in drawings; o Repair existing crickets specified in drawings. • Install roofing system in accordance with manufacturer’s recommendations; • Install blocking and nailers where required; • Install roofing system in accordance with the following NRCA Manual Plates and NRCA recommendations; o Modify as required to comply with manufacturer's approved details and perimeter fastening requirements of FM Global references if applicable