Specifications include, but are not limited to: Demolition of the SON Building (constructed in 1972, consisting of seven floors totaling approximately 83,000 GSF), including interior abatement and demolition followed by full building demolition, and rebuilding a portion of the exterior envelope of Clinical Sciences Building (CSB) where the SON Building currently connects with the south side of CSB. Some SON Building elements may remain. Structural retrofitting of the existing utility chase wall at the south and southwest corner of SON Building, likely to remain post‐demolition. Partial demolition and building enclosure modification of the Campus Support Services Building (formerly Laboratory of Radiobiology or LabRad). Rerouting or protecting existing utilities as required. Site Excavation/Stabilization. Utility Infrastructure to support PRAB prior to equipment start up and future west campus development. o Chilled water, connecting to existing infrastructure at the Hooper Pad o Domestic water, connecting to existing infrastructure at the Hooper Pad o Non‐Potable water, connecting to existing infrastructure at the Hooper Pad o Non‐Potable water Storage tank(s) and pump(s). Landscape and accessible hardscape Identification and removal of defunct utility infrastructure to support the above scope, including at Hooper Pad. Close Coordinate with PRAB project team, PH Logistics Team, and other affected projects for utility support and other activities during all phases of project delivery.