Specifications include, but are not limited to: The project generally consists of site construction, building construction, pipeline installation, and equipment installation for groundwater treatment systems. The work includes, but is not limited to mobilization, demolition, and site excavation; well pump, discharge pipeline, and electrical modifications; replacement of a suspended flexible expansion joint and waterline piping on the Bouquet Canyon Road Bridge; water and drain pipelines installation; equipment installation for an ion exchange system and GAC system (pressure vessels, pipes, cartridge filters, etc.); chemical storage/feed system installation; building construction; retaining wall construction; electrical work; system start-up including owner furnished ion exchange resin, coordination and system flushing; and all associated work (“Work”) as indicated in the Contract Documents.