Specifications include, but are not limited to: 1.Edgewood Campus (Career Center Building) a.Remove existing roof membrane system, skylight and curb down to existing roof deck. Infill skylight opening with new steel framing and decking. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over ridged layer insulation, tapered insulation where indicated and cover board insulation. Provide crickets where indicated. Raise concrete scupper openings where indicated. b.Lighting & Drywall: Modify existing drop ceiling for new drop ceiling, sprinkler and lighting systems. 2.Urban Campus (TIE Building) a.Remove existing roof membrane systems down to existing roof decks. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over ridged layer insulation, tapered insulation where indicated and cover board insulation. Provide crickets where indicated. Install new coping caps, gutters, downspouts, etc. b.Re-point, clean and seal masonry as indicated. 3.Urban Campus (Pro. Services Building) a.Re-point, clean and seal masonry as indicated. b.Re-work scupper for proper drainage 4.Boone Campus (C.A.M. Building) a.Remove loose foil at flashings and overlay new foil faced flashings. b.Re-flash roof drains w/ liquid applied flashing. c.Re-seal pitch pockets w/ pourable sealer 5.Boone Campus (C.A.T. Building) a.Remove loose foil at flashings and overlay new foil faced flashings. b.Re-flash roof drains w/ liquid applied flashing. c.Re-seal pitch pockets w/ pourable sealer d.Repair coping cap joints 6.Boone Campus (Bookstore) a.Remove loose foil at flashings and overlay new foil faced flashings. b.Patch fish-mouth in cap sheet 7.Edgewood (Transportation) a.PVC Roof Overlay