Specifications include, but are not limited to: 2.1 Construction Administration (CA) of the construction contract will be conducted by the consultant in full cooperation with the Project Manager (PM) designated for the project. 2.2 On-site personnel and equipment provided by the Consultant may include but are not limited to: Project Engineer Office Engineer Materials Inspector(s)/Technician (s) Electrical inspector Field Inspector(s) with experience in earthwork, grade, surveying, and construction traffic control requirements. SWPPP inspector(s) for environmental compliance. AK - CESCL certified Project Vehicles Field equipment including but not limited to nuclear density gauges, computers, network printer /scanner/copier, and software, mobile phones, safety equipment, rainwear, etc. Fully equipped material’s laboratory 2.3 The project-specific NTP will identify the specific tasks as described in this Appendix B.