Specifications include, but are not limited to: The Work consists of the removing a 2’-0” x 2’-0” area of stone veneer at the wall between the amphitheater stage and the backstage/greenroom, and exposing CMU wall behind at 2 locations per plan. Core drill a 8” diameter hole for the installation of a 8.626” outside diameter schedule 40 stainless steel conduit with a locking well cap at 2 locations on amphitheater wall. The dock also consists of providing potable water ground mounted hose bibs for use during events at the amphitheater. Potable water point of connection is an existing 10” potable water line after DCDA at the corner of Grand Central Parkway and N. County Government Center. This improvement will supply potable water during events for up to (9) food vendor stations and (1) temporary bathroom.