Specifications include, but are not limited to: I-5: Aurora Donald Interchange (Exit 278) Phase 2 Section of the Pacific Highway (Rt. No. I-5) in Aurora. FAP No. S001(554). (Over $ 30,000,000). Req. approx. 9,300 hr training; 5,000 ft2 temp sign; 10 ea PCMS; 4 ea radar spd trial; 2,500 hr flag; 6 ea flag sta light; 520 ea TCS; 400 hr BPA watcher 215,000 ft temp stripe; 76,000 ft stripe rem; 49,700 ft temp barr; 42 ea temp impact atten; 4,000 ea ref barr panel; 4,500 ft temp glare screen; temp illum; 315 ft PCD; const/rem temp road; temp drain facility; temp water mngt facility (301 ft pipe; 1,165 yd2 plastic sheet; 1,550 ea sandbag); temp retain wall; 5,000 yd2 plastic sheet; 19 acre temp mulch; 1,030 yd2 matting; 166 ea check dam; 7 ea const ent; 4,500 ft sed fence; 157 ea inlet protect; 12,450 ft sed barr; 12,952 ton contam soil disp; 4,500 ft2 const mat; const surv work; 142,354 yd3 gen exc; 1,950 yd3 select gran backf; 93,500 yd2 treat subg; 3,244 yd2 drain geotext; 105,000 yd2 subg geotext; 51 yd3 riprap; 12 ea riprap basin; 22,350 yd2 subg/emb stabil; 153 yd3 trench fndtion; 22,000 ft vid insp; 9 ea drain outlet; 11,628 ft pipe; 14 ea slip joint; 700 ft2 pvd culv end slope; 40 ea conc manhole; 48 ea conc inlet; 230 ft drain curb...