Specifications include, but are not limited to: MODULAR UNIT #1 • Minimum of six (6) elevated events o All components must interconnect to form one modular unit. The components shall not be free standing. • Rated for ages 5 – 12 • Design, Materials and Workmanship: Must be equal to or better than the SportsPlay Zack Modular Play Unit 911-131B. • A sample layout in included for reference. ATTACHMENT “A” • Color configuration: To Be Determined • Warranty: Include information for what is covered, the duration and any limitations. • The vendor must indicate the specific Brand, Model Number and Features included on the equipment submitted for consideration. Include any product literature or information. MODULAR UNIT #2 • Minimum of seven (7) elevated events o All components must interconnect to form one modular unit. The components shall not be free standing. • Rated for ages 2 – 12 • Design, Materials and Workmanship: Must be equal to or better than the SportsPlay Bobbie Modular Play Unit 911-124B. • A sample layout in included for reference. ATTACHMENT “B” • Color configuration: To Be Determined • Warranty: Include information for what is covered, the duration and any limitations. • The vendor must indicate the specific Brand, Model Number and Features included on the equipment submitted for consideration. Include any product literature or information. Installation • The Contractor must provide all tools, transportation, services, supervision, materials and equipment necessary for and incidental to satisfactory completion of required work in compliance with all codes, ordinances, rules, regulations, order and other legal requirements of public authorities which bear on performance of the required work. • The Contractor shall be responsible for delivery and staging of equipment. SCS shall bear no responsibility for meeting deliveries or for loss of materials at the jobsite. • The Contractor shall strictly follow all instructions from the manufacturer when assembling and installing equipment. • The Contractor shall employ the services of a Certified Playground Inspector to provide a thorough inspection of the equipment prior to use by students. Documentation for the Certified Playground Inspector must be included with the bid documents. • While digging, the Contractor may encounter excessive rock during the installation process. SCS will allow the Contractor to submit a Change Order for additional cost related to excessive rock removal (aka rock clause). Blasting is strictly prohibited. • The Contractor shall coordinate the installation with SCS Maintenance Personnel to determine suitability of the location and to determine if any underground utilities are present. • The Contractor shall provide clearly visible warning and directional signs, barricades, and general protection of persons from all hazards created during the installation process.