Specifications include, but are not limited to: 1. Permitting as necessary (town job – no permit fees). 2. Provide all necessary labor and other work as required. 3. MOBILIZATION - Mobilize the necessary equipment to perform the required work. Fee includes all that is necessary to set up the job and organize the necessary equipment that is needed to load and mobilize to and from the job site each day. 4. Use a "High Powered' Cleaning apparatus; thoroughly clean existing surface free of all algae, mold, dirt and any other foreign materials on the courts. Specify all other methods that will be used to eliminate court vegetation. 5. COLOR COATING- Furnish and install (at a minimum) two (2) coat acrylic color coating to entire area: One resurfacer coat and one finish coat. 6. PICKLEBALL LINE STRIPING- Layout and stripe all lines per USAPA. Apply one coat of acrylic line primer. Once line primer has cured apply one (1) coat of textured white line paint.