Specifications include, but are not limited to: e installation of new pump discharge piping including piping, valves, flowmeter (owner provided), monitoring systems, and appurtenances, new electrical systems including new station control panels, new chlorination system, new louver installation in existing CMU wall, new double door installation, new generator and pad, new sidewalk, new metal roofing system, new architectural cladding system, new roof pump access hatch and roof repairs, and demolitions of existing piping, roofing, and CMU wall sections required for new installations. The Work also includes electrical connections to existing electrical service equipment, and installation of owner provided heaters and exhaust fans. Construction of piping and chlorination system are for use in a drinking water system.