Specifications include, but are not limited to: General: Sequence, coordinate, and integrate the various elements of electrical systems, materials, and equipment. Comply with the following requirements: 1. Coordinate electrical systems, equipment, and materials installation with other building components. 2. Verify all dimensions by field measurements. 3. Arrange for chases, slots, and openings in other building components during progress of construction, to allow for electrical installations. 4. Coordinate the installation of required supporting devices and sleeves to be set in poured-in-place concrete and other structural components, as they are constructed. 5. Sequence, coordinate, and integrate installations of electrical materials and equipment for efficient flow of the Work. Give particular attention to large equipment requiring positioning prior to closing in the building. 6. Where mounting heights are not detailed or dimensioned, install systems, materials, and equipment to provide the maximum headroom possible. 7. Coordinate connection of electrical systems with exterior underground and overhead utilities and services. Comply with requirements of governing regulations, franchised service companies, and controlling agencies. Provide required connection for each service. 8. Install systems, materials, and equipment to conform with reviewed submittal data, including coordination drawings, to greatest extent possible. Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. Where coordination requirements conflict with individual system requirements, refer conflict to the Architect.