Specifications include, but are not limited to: o Mobilization; o Preparation of shop drawings and other required submissions; o Ordering, fabrication, assembly, andlor stockpiling of materials; o Driving Test Piling; and o Contract surveying, when Roadway and/or Bridge Construction Control is included in the Contract. o Erection of advance warning signs. o Installation of netting on structures to prevent nesting of migratory birds in accordance with applicable Special Provisions (if included in the Contract). o Set up, installation, and testing of Automated Work Zone Information Systems (if included in the Contract). o Off-site area approval process per Section 107.10(c). Such advance work shall be subject to the Contractor's assumption of the risk of cancellation of the award and the following: . The Contractor shall, on commencing such operations, take all precautions required for public safety and shall observe all the provisions in the Contract; o In the event of cancellation of the award, the Contractor shall at Contractor expense do such work as necessary to leave the site in a neat condition to the satisfaction of the Engineer; o In the event of cancellation of the award, all work performed shall be deemed to be at the Contractor's expense; and . All work done under this subsection in accordance with the Contract before its execution by the Commission will, when the Contract is executed, be considered authorized work and will be paid for as provided in the Contract.