Specifications include, but are not limited to: PHASE 1 - Independent Structural Engineering Review as outline in the ACEC Structural Engineer Coalition’s “Recommended Guidelines for Performing an Independent Structural Engineering Review in the State of Connecticut by an Independent Structural Engineer: Basic Services.” • Review design criteria indicated and compare to minimum code requirements. • Review subsoil information and recommendations regarding building foundations by geotechnical engineer. • Conduct bay studies of structural systems to determine conformance with the minimum requirements of code and design criteria. • Review a random selection of purlins and girders for vibration. • Review a random selection of concrete slabs on metal deck for structural adequacy. • Review lateral force resisting system for conformance with the minimum requirements of the building code and design criteria. • Review a random selection of foundations for conformance. • Review proposed sections and details for potential coordination conflicts. • Review a random selection of connections. • Review structural specifications. Review the primary structural systems of both the superstructure and foundations. The Structural Engineer-of-Record will furnish calculations for the primary structural systems upon request for review. At the conclusion of Phase 1, prepare a written report regarding your findings for review and response by the Architect and Structural Engineer-of-Record. PHASE 2 – Statement of Professional Opinion • Review responses from the Architect and Structural Engineer-of-Record • Discuss any remaining review / design issues with the design team (Architect and Engineer) for resolution. • Prepare a written opinion statement regarding the findings of our review to present to the Owner and for the local Building Official. PHASE 3 - Construction Phase Structural Engineering Review • Review any major revisions to the primary structural systems during the construction phase for conformance with the minimum requirements of code and design criteria. • Review any delegated design submittals associated with primary structural submittals such as structural steel connection designs and cold-formed metal framing.