Specifications include, but are not limited to: The selected firm will have the responsibility to provide the scope of services described herein through its own firm’s capabilities and/or consultants as expressly approved by the Owner. The basic project information (to be confirmed by the consultant) is as follows: • The proposed structure will be approximately 96,058 GSF • The total site area is 18 acres • The proposed structure will have two floors of classrooms • Common area spaces, i.e. Gym, Media Center, Cafeteria will be large open spanned • The proposed structure will consist of cast-place concrete frost walls and structural steel framing • The mechanical system will incorporate chilled beams, geothermal wells and ground source heat pumps • The architect is Tecton Architects • The civil engineer is Benesch • The structural engineer is Michael Horton Associates • The mechanical, electrical, plumbing engineer is Kohler Ronan; The basic scope of Independent 3rd Party Code Reviewer services shall be based on the above noted project description: • Construction. Conduct reviews of the submitted construction documents and specifications to determine the degree of compliance with the 2022 Connecticut State Building, 2022 Connecticut Fire Safety Code, and 2022 Connecticut Fire Prevention Code, and the 2010 ADA Standards for Accessible Design, and any other applicable codes and standards. This review shall include any revisions or replies submitted in response to review comments. • Prepare and submit a written Plan Review Record (PRR) [MS Word format] and an IBC Plan Review Record summarizing the review findings, which will present issues of non-compliance or areas requiring clarification together with the applicable Code references. • Conduct a review of the plans and specifications to determine the degree of compliance with Section 504 of the Rehabilitation Act of 1973 and The Americans with Disabilities Act of 1990, including the 2010 ADA Standards for Accessible Design. Submit a letter about your findings. • Include the results of your documents review, a log of coordination items, noted during the code compliance review that contractors could use to start a change order process. • Complete and submit the initial review(s) within thirty (30) days of receipt of authorization to proceed. Complete all subsequent reviews of revised documents within seven (7) calendar days from date of receipt. Electronic copy of the documents and one full-size hard copy set of the drawings will be provided. • Upon satisfactory resolution of all items within the Plan Review Record (PPR), submit a completed PRR with signoffs for each numbered item along with the IBC Plan Review Record for the scheduled PCR dates. Stamp and sign reviewed documents with revisions where required. • Include all stakeholder inquiries, video and in person meetings and travel costs to and from meetings.