Specifications include, but are not limited to: Work items include: • Contractor is responsible to compare Scope of work to the house and drawings and submit questions before bid opening. • Obtain building permit and engineering stamp for seismic retrofit. • Remove lower portion of the roof covering and decking from the roof to gain access to top of brick walls for the seismic roof to wall connection. • Install pins, bolts, framing anchors, blocking and straps as per engineering plans and details for the building permit. • Bracing of chimney(s), if applicable, per engineering plans and details for the building permit (3) • After final inspection is completed, install roof decking where removed. • Install new roof covering to match existing, as close as possible, along the perimeter of the home where removed for seismic retrofit.