Specifications include, but are not limited to: Iowa PBS is requesting an upgrade of its two existing graphic generator systems, one installed and used in its mobile production unit, and one installed and used in the television station studio. The reasons for upgrade are: - New units have functionality and capacity that will replace other existing end of life hardware in the mobile unit, and give functionality that has been lost because of past hardware failure in the studio. - Video system in the mobile unit and studio can only understand NTSC 1080i video standards, - Space available in the mobile unit for hardware make up the systems must match the existing unit. The available space is 4U (4 rack units). - Connectivity, ins and outs, must match the existing units. Commissioning for both systems: Description - Remote commissioning (2 days); Two days of remote or onsite commissioning for both systems (Iowa PBS will have systems installed and connected); Training for both systems: Description - Remote or onsite training (5 days); Five days of remote or onsite training once commissioning is completed.