Specifications include, but are not limited to: All broken pavement shall be removed from the street immediately and from the general work area within 24 hours. Tack coat shall be applied to the existing pavement as shown in Exhibit A and Exhibit B. Asphalt speed cushions shall be constructed in accordance with Exhibit A and Exhibit B, shown on pages 18 and 19 of this contract. Hot-mix patching material shall not be placed on wet or frozen sub grade. Temperature for hot-mix materials shall be between 225 degrees F and 325 degrees F. ‘Burn Truck’ shall be used with speed cushion installation, unless instructed otherwise. Saw cut shall be used to make asphalt and concrete cuts. Roller shall be used for the compaction of hot-mix materials. Single and Tri-axial Trucks shall be used to haul materials and haul off excess materials. Bobcat (Including Attachment Needed) shall be the hourly rate for use of skid steer equipment and any attachments necessary.