Specifications include, but are not limited to: Disconnection of existing 150 KVA Uninterruptible Power Supply (UPS), batteries, and all interconnected components & relocation of the equipment to a predetermined location within the National Bowling Stadium. Procurement and installation of a 60KVA/KW UPS, new or refurbished is acceptable, along with a new isolation bypass transfer switch, and new battery cabinet(s) (minimum runtime of 90 minutes +/- 20% @ 40KW). The package shall have 480 input/208 output 3 phase inclusive of stepdown transformer and must meet and include Section 263353 requirements. The existing circuit breaker feeding the existing 150 KVA UPS shall be replaced with a new 100A/3 breaker. The new breaker shall be of the same manufacturer type as existing; AIC rating as existing.