Specifications include, but are not limited to: Removal and replacement of a failed CMP that services Last Chance Ditch crossing under Lakeside Drive per the Improvement Plans. The failed pipe is located roughly 200' south of Evans Creek Drive, located in Washoe County, Nevada. Replacement work includes installation of two 36" reinforced concrete pipes, construction of double barrel headwalls with trash rack, installation of barrier rail, guard rail, and traffic safety impact cushions. Additional work includes clearing and grubbing, grading, placement of riprap, and asphalt paving. Contractor to provide construction surveying and traffic control throughout the duration of the project. Miscellaneous work includes replacing traffic control signs, removal and replacement of an irrigation service line, and hydroseeding. Clarification is given in the "Bid Clarification" and accompanying exhibits.