Specifications include, but are not limited to: The work will include but is not limited to the supply and installation of one emergency generator and automatic transfer switch for the East Kennedy Stormwater Pump Station. As part of the work, the existing emergency generator will be removed along with the existing manual transfer switch, power panel, transformer and power panel breaker. These will be replaced with new components properly sized for the new emergency generator electrical requirements. New conduit and conductors will be routed between all new components. This work will also consist of site restoration, concrete pads and sidewalks and related appurtenances. The contractor shall be responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Construction Documents.