Specifications include, but are not limited to: Furnish all labor, materials, equipment, insurance, supervision, waste disposal, and all other incidental items to complete the replacement of the gym flooring and add alternates as selected. Flooring shall be Taraflex Sport M+ or comparable with a suitable underlayer such as Isosport. The new flooring shall include the painting of three (3) pickleball courts, two (2) volleyball courts, and one (1) basketball court lines. Sport court markings, desired line colors, and code footprint of area are attached in this document. All court lines shall be 2” in width with the exception of pickleball which shall be 1” in width. Additional 1” volleyball service lines are required at the 18’ and 21’ on the right half of each volleyball court. Desired color of the flooring is Maple. Contractor is to provide a smooth transition from the new floor installation to all gym exits and closets. No new flooring shall be added to the existing storage areas located in the gym. All transitions from and to the gym shall be ADA compliant. Existing volleyball floor anchors to remain in same positions and flush with new flooring. Any non-fixed, moveable furniture shall be removed by City Staff prior to installation.