Specifications include, but are not limited to: a. Primary Objective. A final design, permitting and bid document package will be prepared for three of the flood control facilities identified in the feasibility report. These three sites are listed below as items i, ii and iii. A reduction to the flows documented in the current Flood Insurance Study for the Pine Nut Creek watershed will be documented with FEMA as based on revised hydrology currently being worked under a separate project. i. Redhawk Basin APN: 1220-02-001-031 ii. Mel Basin APN: 1221-06-001-038 iii. Myers Basin APN: 1221-05-001-054 b. Secondary Objective. The feasibility study prepared a preliminary design and cost estimate for the five flood control facilities list below. These preliminary designs and cost estimates will be advanced to a 90% level. i. Bently Basin 1 APN: 1221-04-001-012 ii. Bently Basin 2 APN: 1221-04-002-001 iii. Janelle Basin APN: 1220-01-001-069 iv. Denmar Basin APN: 1220-02-001-003 v. Syphus Basin APN: 1220-02-001-029