Specifications include, but are not limited to: 1. Rehabilitation of the following areas with asphalt mill and inlay: The northern portion of Taxiway T; South Runway (10R-28L) Exits B1, B3, B4, C8, and E; and Runway 3-21 Exit C and the C West Arm/DeArm Area. 2. Reconstruction of Taxiway K between Gates D3 to E1. 3. Providing new centerline lights, conduits, and conductors, and removing and resetting existing centerline lights as shown on the drawings. 4. Providing storm drainage, utility adjustments, pavement grooving, and pavement markings. Also included is an additive alternate for work that is not funded by the FAA’s Airport Improvement Program (AIP). This work includes rehabilitation of Taxiway A from Exits A5 to W and Exits A2 to A1. The additive alternate work may be awarded solely at the option of the Port.