Specifications include, but are not limited to: Install temporary erosion control (contractor furnished material). Remove and legally dispose of existing tack designated to be removed, drain pipes, headwalls, chain-link fencing and gates, light poles, etc. Excavation and legal disposal of excavated material. Place crushed stone for loop roadways (NOPB furnished material). Furnish and install geotextile fabric (contractor furnished material). Furnish and install geogrid (contractor furnished material). Furnish and install drain lines including sheeting, drainage fabric, bedding and backfill (contractor to furnish sheeting, drainage fabric and pipe)(NOPB to provide crushed stone bedding). Place and compact sub-ballast (NOPB furnished material). Install turnouts (NOPB furnished material). Install track including placement of ties rails and other track materials (NOPB furnished material). Surface track including placement of ballast (NOPB furnished material). Furnish and install track end treatments (NOPB furnished material). Furnish and install chain-link fencing and gates (contractor furnished material). Furnish and install concrete driveway aprons (contractor furnished material). Furnish and install asphaltic concrete pavement (contractor furnished material).