Specifications include, but are not limited to: aines Borough intends to replace a portion of the Haines School roof membrane system in the 2024 summer season. We expect to award a contract this winter. Phase II roof replacement is approximately 9,200 square feet. Phase III roof replacement is approximately 16,000 square feet. The successful Contractor shall:1.Remove and dispose of the existing membrane and cover-board.2.Design, furnish, and install a new roofing system, including roof, curbs, parapets, and drainage, according to the attached as-built drawings and Duro-Last Roof Assembly Specification.3.Issue submittals.4.Perform testing and inspections.5.Submit As-Built Drawings.6.The successful bidder will inspect the roof drainage piping and submit a proposal for any needed repairs.