Specifications include, but are not limited to: 1. Existing exhaust system to be removed and disposed. Insulated exhaust shroud was tested and found to NOT contain asbestos. 2. Existing pump station pumps are two 75 HP motors with Variable Frequency Drive (VFD). 3. Other major electrical loads: hydraulic Comminutor 5 HP, 460 Volt/3 phase/60 Hz. 4. Existing Convault fuel tank to remain. Contractor shall replace fuel line and fuel delivery appurtenances if required for new generator and/or code requirements. 5. Existing generator has remote cooling system (Modine Model KC3‐2) due to flood elevation. Contractor shall furnish and install similar appropriate (sized for new generator) new remote cooling system on new generator system. Location of new remote cooling system shall be same as existing. Contractor shall make modifications to building at no additional cost if necessary to accommodate new remote cooling system. 6. EXISTING ATS will remain. Contractor does not need to furnish & install new ATS at this pump station. 7. Contractor shall coordinate new generator with existing ATS as required to provide fully integrated and operational emergency power system, providing all labor, materials and appurtenances as required to integrate new generator with existing ATS.