Specifications include, but are not limited to:Overall responsibilities of the successful firm will include the following: a. Ownership, installation, repair, maintenance and warranty of all point-of-use supplies and spray systems at locations. b. Provide system consulting, configuration, and other services required to plan and implement a point-of-use system at all locations. c. Training/certification for up to 30 employees yearly d. Manufacturer support required. e. Collaborate effectively with designated UTA personnel. f. Consign, stock, monitor, and replenish inventory at all locations. All inventory should be stocked at least once a week with any out of stocks being filled within 24 hours of notification. g. Expired material removed at least 30 days prior to expiring. h. Must have a warranty program. Please include in your proposal. i. Any exceptions to this scope of work will need to be clearly stated in the proposal. j. Grade A Customer Service Proposer’s Project Requirements a. Provide, transport, and install all applicable material required for a vendor managed system. b. Work with designated UTA staff on initial and ongoing configuration of equipment and point of use locations. c. Collaborate with designated UTA staff on initial and ongoing product categories and items to include in vendor managed system.