Specifications include, but are not limited to: Contractor shall furnish all labor, materials, tools, equipment, and supplies necessary to asphalt a new parking area and housing pad for the Louisiana Department of Corrections, Allen Correctional Center. The parking area will be on Allen Correctional Center property west of the front entry gate and south of Lauderdale Woodyard Road. The housing pad is located north of the facility service road and west of the main entrance drive. Contractor shall: Provide soil test at both parking area and housing existing soil pads to ensure proper base materials and adhesion of soil cement for laying of asphalt parking lot, housing pad and entry roads. Provide all equipment and materials required for proper elevations and grading to ensure drainage, and that there will be no “ponding” of water on the parking area, the housing pad or entry roads. Incorporate eight and one half inches (8 ½”) of soil cement base to the parking area, housing pad and each of the entry roads. Overlay the soil cement base with two inches (2”) of PG 67-22 hot mix asphalt or equal.