Specifications include, but are not limited to: The work to be performed under this contract includes a parking lot expansion and new sidewalk at the Hall Memorial Library, 93 & 99 Main Street in Ellington. The scope of work includes reclamation and re-pavement of 965 square yards of existing bituminous parking lot, installation of approximately 2,860 square yards of new bituminous parking lot and 4,133 square feet of concrete sidewalk. There is a potential for an addition/alternate scope items to include the reclamation and re-pavement of an additional 1,636 square yards of existing bituminous parking lot, installation of an additional 1,180 square feet of concrete sidewalk, and replacement of existing site light poles and fixtures. The project consists of providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to completion of the work shown on the plans and described in the specifications including, but not necessarily limited to the following: reclamation and re-use of existing bituminous pavement, demolition and disposal of existing curbing and concrete sidewalk, installation of storm drain structures and piping, installation of new bituminous parking lot, installation of pole mounted light fixtures, installation of new concrete sidewalk and curb ramps, installation of a segmental block sitting wall, landscaping and field verifying.