Specifications include, but are not limited to: Install New 6" Curb Quantity: 18 UOM: Linear Feet; Saw Cut, Remove, and Dispose of the Existing Sidewalk Sections and Replace with 4" Concrete Sidewalk, including WWF, base as needed and yard/edge restoration Quantity: 130 UOM: Square Footage; Rain Gardens - Remove and Dispose of Existing Pavement, Base, Soil, and Concrete. Excavate to 36" Below the existing grade and replace it with 18" of washed aggregate, filter fabric wrapping soil, 14" blended soil, and 4" rock mulch. Wrap with curb Quantity: 739 UOM: Square Footage; Remove Stone Curb From Rain Garden and Install New Sidewalk Quantity: 13 UOM: Linear Feet; Remove the Existing Concrete and Remaining Pole Stub. Add 12" topsoil and sod Quantity: 45 UOM: Square Footage; Install ADA Ramps, including Class 7 base and yard restoration Quantity: 25 UOM: Square Footage