Specifications include, but are not limited to: Existing infrastructure consists of a projector location with power, 1 gang surface mount speaker locations above the left and right corners of teaching-wall whiteboard, PAC501B box at rear of room for confidence monitor, a 3-gang box (for XLR input/output and Dante connection located rear/right of room beneath PAC501B), a 1 gang box roughly 4’ to left of PAC501B for rear cameras, Crestron Zum LV Light switch located in one half of a 2-gang box by entrance and Crestron Zum lighting controllers located above drop ceiling (in room, exact location TBD), a 1-gang box at 48” AFF to right of projection screen for LV screen control, and an FSR WB-X2-GNG wall-box mounted flush with finished floor behind credenza location. All wall box conduit stubs out into drop ceiling. CONTRACTOR to install following equipment with all necessary cabling: motorized screen with LV control wall switch, credenza, occ sensor in drop ceiling roughly centered in room, table top touch screen on credenza, HDMI and USB input cables issuing from credenza for user BYOD connection, projector pole/mount, projector, surface mount loud speakers, ceiling mounted 70v loudspeakers for speech, XLR and RJ45 auxiliary connection points at rear of room and in credenza, wireless microphone charger on top of credenza, wireless microphone access point on drop ceiling towards center of room, ceiling microphones centered between front and back of room providing equal coverage, PTZ cameras to the side of left channel loudspeaker, infrared emitter for ADA assisted listening system to the side of front mounted cameras, confidence monitor at rear of room in PAC501B back box, PTZ cameras at rear of room near confidence monitor, dsp/video/network switch and other remaining items to be housed in credenza, Crestron LV Shade switch located in other half of 2-gang box by entrance, Crestron shade controller located on north wall above drop ceiling, Crestron shades in all windows, and any necessary cabling.