Specifications include, but are not limited to: The saw cutting of the outline of the patch area, removing temporary patches and a portion of the base material, as necessary, or as ordered from prior utility cuts, compacting base material within the trench to the bottom elevation of the permanent A.C. patch, tacking the edges of the cuts, locating and raising of manholes, vaults, water or gas valves, and survey monuments, removal and reconstruction of vehicle detection loops, placing and compacting A.C. pavement material within the limits of the area prepared and repainting of pavement markings and striping, along with all other appurtenant work necessary to complete the work specified. In some instances, removal of the existing asphalt pavement by milling to a two inch depth in the vicinity of the patch area and subsequent overlay repaving will be required. Contract prices in the “Schedule of Prices” forms shall be considered full compensation for all labor, materials, tools, equipment, overhead profit, insurance bonding, taxes, and all other incidentals necessary to complete the construction as shown on the Improvement Plans and/or as specified in Contract Documents under this Contract. Actual installed quantities of each item proposed on a unit price basis will be determined during construction in the manner set up for each proposed item in these Specifications. Payment for all items in the “Schedule of Prices” forms will constitute full compensation for all work shown and/or specified to be performed under this project.