Specifications include, but are not limited to: Providing all labor, materials, supervision, etc., to complete concrete repairs and waterproofing related to the exterior of the Yankee Doodle Parking Garage. Bid Item 1.A - General Mobilization/Demobilization: This line item shall consist of all labor, materials, tools and equipment required for setting-up general plant, storage/staging areas and facilities required to facilitate construction or as otherwise required by applicable Federal, State and Local laws; and the general mobilization of equipment required for the completion of the work as shown within the Bid Documents and all expenses for de-mobilization off the site upon completion of all work as shown within the Bid Documents. Electricity (power) and water required for the completion of the work shall be furnished by the Owner at existing fixtures or outlets (The Owner will not provide any temporary pipes, cables, etc.). If the capacity of existing utilities is insufficient for the contractor's use, the Contractor shall be responsible for supplementing this capacity as required at no cost to the Owner. The contractor shall provide temporary lighting within designated work areas, as required. The Contractor shall furnish, install, maintain, relocate and remove all signs, barricades, cones, warning lights, and other safety control devices and temporary signage required for the proper execution of the project. The Engineer and the Owner shall review the safety control device placement before work begins and prior to the beginning of work on any subsequent construction stages. Any deficiencies in the location or arrangement of devices shall be corrected by the contractor before starting work or as the work progresses towards completion.