Specifications include, but are not limited to: Removals 1 Clearing and Grubbing (Incl. clearing of all shrubs, grass, and obstructions within roadway footprint, off-site disposal, stripping 6 to 8 inches deep and temporary stockpiling/windrowing of topsoil for replacement in disturbance and embankment slope areas). LS 1 0.0 2 Remove Existing 24" Vitrified Clay Sanitary Sewer Pipe (Incl. trench excavation and re-use of native soils as trench backfill) (a) LF 250 0.0 3 Roadway Excavation - Re-Use as Roadway Embankment (Incl. subgrade prep) (Excl. clearing/grubbing, utility trenching paid elsewhere) (a) CY 120 0.0 4 Roadway Excavation - Dispose of at Project Spoils Stockpile (Incl. subgrade prep) (Excl. clearing/grubbing, utility trenching paid elsewhere) (a) CY 380 0.0 5 Remaining Removals, Resets, and Adjustments not Specifically Paid for Elsewhere LS 1 0.0 Fill & Pave 6 Woven Structural Fabric (Mirafi RS280i or approved equal) (b) SY 1,040 0.0 7 Aggregate Base Course and Trench Backfill where Required Due to Losses or Poor Native Soils (CDOT Class 2) (Incl. placement, moisture conditioning, compaction, testing) (c) Ton 1,000 0.0 8 Aggregate Base Course (CDOT Class 6) (Incl. placement, moisture conditioning, compaction, testing) (c) Ton 500 0.0 9 Hot Mix Asphalt (Grading SX) (Ndesign 75) (PG 64-22) (4" thick) (Incl. placement, compaction, testing) (c) Ton 200 0.0 10 1.5" Angular Trench Subgrade Stabilization Rock (Where required, incl. overexcavation and off-site disposal of poor soils) (c) Ton 200 0.0