Specifications include, but are not limited to: Description: Contractor shall deliver three (3) 6-yard and two (2) 2-yard dumpsters to the following locations: ● Two (2) 6-yard and one (1) 2-yard dumpsters to the Campground ● One (1) 6-yard dumpster to the Cabin Area ● One (1) 2-yard dumpster to the Park Office Description: Contractor shall empty waste from dumpsters identified in Task 1 on a weekly basis for the April 1 through November 30 time period. Description: As determined by the DNR, the Contractor shall empty waste beyond what is collected in Task 2 from up to five (5) dumpsters per pick-up during the May 1 through October 31 time period at the following locations: ● Two (2) 6-yard and one (1) 2-yard dumpsters at the Campground ● One (1) 6-yard dumpster at the Cabin Area ● One (1) 2-yard dumpster at the Park Office