Specifications include, but are not limited to: The contractor shall provide all labor, materials, equipment, associated travel and lodging cost to: Furnish and install “DeTekion” Sensor Cable and Command Processor Controller fence-mounted intrusion detection system or state approved equivalent to the surrounding facilities. Furnish all “DeTekion” Processors, Cable Terminators, Communications Cards, Wireless Gate Sensors, Receivers, Antennas and Power Supplies required for a fully functional installation. Furnish all technical labor for programming, graphics modifications, factory start-up, commissioning and certification of the installation per “DeTekion” standards. Furnish As-built Drawings and O&M Manuals. Furnish owner/end user training. At completion of installation, Manufacturer representative fully tested and confirmed installations per plans and specifications. Asbestos Containing Materials (ACM) is present in both facilities. Contractor required to plan work to identify and avoid disturbance of ACM. ACM survey reports available upon request. Priority of installations shall be: 1. FCC Sensor Cable and Command Processor Controller (Bid Base) 2. LCCC Sensor Cable and Command Processor Controller (Bid Base) 3. FCC Barbed Tape Sensor Coil Hybrid PIDS (Add alt. 1) 4. LCCC Barbed Tape Sensor Coil Hybrid PIDS (Add alt. 2)